phone screen background.jpg

Where vision meets construction

Our Services

  • Building construction

    United Construction has been providing construction management and general contracting services to clients in the Ethiopia for years. We construct and renovate corporate office buildings, hospitals, retail buildings, hotels, universities, correctional facilities, structured parking facilities, and residential towers.

  • Road Construction

    We aspire be leaders in the field of road construction and earthworks, providing top quality work to our clients whilst being competitive and achieving high productivity levels

  • Water Structure Works

    United Construction is committed to safe, timeous, high quality, innovative and cost effective water structure construction. We actively commit to the principles of sustainability through the implementation of good corporate governance and safety, health and environmental best practice on all our projects.

our builds

Mekelle University

  • Building

  • 33,652,533.31 birr

  • October /13 / 2016 GC

United Construction PLC, a Grade 1 construction company established in 2003, was awarded a significant infrastructure development project by Mekelle University. The scope of the project involved the execution of various essential civil works across multiple campuses of the university.

The key deliverables of the project included:

  • Construction of the Perimeter Fence at the main gate of the University, designed to enhance campus security and define the institutional boundary with a durable and aesthetically coordinated structure.

  • Establishment of Guard Control Posts (Guard Houses) across all campuses, built to modern security standards, ensuring safe, functional, and strategically placed monitoring stations for campus security personnel.

  • Development of Public Sanitation Facilities, specifically a well-structured and accessible public toilet block at the main campus, addressing the institution’s commitment to hygiene and public welfare.

Client: Mekelle University
Contractor: United Construction PLC
Project Site: Mekelle, Tigray

Bole Ayat 40/60

  • Building

  • 29,695,642.49 birr

  • 26/06/2014 E.C

Client: City Government of Addis Ababa – Saving Houses Development Enterprise
Contractor: United Construction PLC
Project Site: Bole Ayat, Addis Ababa

United Construction PLC was awarded a major urban housing development project by the City Government of Addis Ababa, represented by the Saving Houses Development Enterprise. The project is part of the government’s strategic 40/60 housing program, aimed at delivering affordable and quality residential spaces to mid-income residents.

Under this agreement, United Construction PLC is responsible for:

  • Construction of Two Blocks, each consisting of one basement level and Ground Plus Nine (G+9) floors, located at the Bole Ayat site.

  • The basement levels are designed to accommodate essential infrastructure including parking and service utilities, optimizing space and ensuring functional efficiency.

  • The G+9 structures are residential buildings designed with a focus on safety, durability, and comfort, incorporating modern standards of architecture and urban planning.

Beza International Church

  • Building

  • Phase I: 41,595,994.94

    Phase II: 66,638135.29

    Phase III: 29,626,245.36

    Total for 2B+G+5 (3200m2 Built) 137,860,375.59

  • June 24 2024, End of the project

Client: Beza International Church
Contractor: United Construction PLC
Project Site: Bole Sub-City, Addis Ababa
Total Built-Up Area: 3,600 m²

United Construction PLC entered into an agreement with Beta International Church to deliver a high-standard institutional construction project designed to serve as a modern worship and multi-purpose facility for the congregation and the broader community.

Under the terms of the contract, United Construction PLC is responsible for the:

  • Construction of a 2B+G+5 Building – comprising two basement levels, a ground floor, and five upper floors, developed on a total area of 3,600 square meters.

  • The basement levels are designed to accommodate utilities such as parking, storage, and mechanical systems, ensuring efficient space utilization and operational functionality.

  • The above-ground structure will include designated spaces for worship, administration, community activities, and auxiliary services, all built to modern engineering and architectural standards.

15 Towns

  • Water supply and Sanitation

  • 2,932,400.57 Euros

  • June 8 2016

Project Name: 15 Towns Water Supply and Sanitation Project
Client: Federal Democratic Republic of Ethiopia – Ministry of Water, Irrigation, and Electricity
Contractor: United Construction PLC
Project Locations: Adigrat and Maichew Towns, Tigray Region

As part of the national initiative to improve access to clean water and sanitation services across Ethiopia, United Construction PLC was awarded a key infrastructure contract under the 15 Towns Water Supply and Sanitation Program. The project is commissioned by the Ministry of Water, Irrigation, and Electricity and focuses on enhancing essential public health infrastructure in selected urban centers.

Under this agreement, United Construction PLC is tasked with:

  • Executing comprehensive water supply system development, including source development, transmission pipelines, storage reservoirs, and distribution networks.

  • Implementing modern sanitation infrastructure, including public sanitation units, sewer systems, and hygiene facilities, designed to serve the growing populations of Adigrat and Maichew towns.

  • Ensuring that all works meet national standards for sustainability, durability, and environmental safety, with a focus on improving the quality of life and public health outcomes in these communities.

Adigrat University

  • Building and Water Construction

  • 125,360,255. 10/100 Birr

  • June 1 2010 G.C

Client: Adigrat University
Contractor: United Construction PLC
Project Site: Adigrat, Tigray Region

United Construction PLC was commissioned by Adigrat University to execute a large-scale infrastructure development initiative supporting the university’s long-term growth and functionality. The project encompasses the full execution of Phase I and Phase II Infrastructure Works, designed to provide the essential groundwork for a modern, self-sustaining academic campus.

Phase I – Lot A:

  • Construction of internal access roads across designated areas to ensure organized and efficient mobility throughout the campus.

  • Implementation of site-wide electrical systems, including lighting, electrical distribution, and power access points.

  • Execution of site sanitary works, including:

    • A comprehensive external water supply system

    • An integrated sewerage system to support hygiene and waste management.

Phase I – Lot B:

  • Similar infrastructure works (internal roads, electrical and sanitary systems) extended to cover the second-phase buildings, ensuring continuity and full utility integration with the initial developments.

Phase II:

  • Extension of infrastructure works to serve the third and fourth phase buildings, including:

    • Additional road networks , Utility installations, Sanitary and water supply systems, Full electrical distribution to newly developed campus zones.

ArbaMinch University

  • Building

  • 37,738,693.88 birr

  • N/A

Client: Arba Minch University
Contractor: United Construction PLC
Project Site: Arba Minch, Southern Nations, Nationalities, and Peoples’ Region (SNNPR), Ethiopia

United Construction PLC was awarded a key institutional infrastructure project by Arba Minch University, aimed at expanding and enhancing the university's academic and operational capacity. The project reflects the university's commitment to providing a well-equipped, functional, and conducive learning environment for its growing student population.

Scope of Work:

Under the agreement, United Construction PLC is responsible for the construction of the following facilities:

  • Classroom Building – A modern, spacious, and fully serviced facility designed to accommodate large student groups, integrated with necessary electrical, lighting, and ventilation systems to ensure a productive academic environment.

  • Laboratory Building – Constructed to meet academic and technical standards, this facility will support practical and scientific learning across various disciplines. It includes appropriate layout designs for lab stations, water and gas piping, safety infrastructure, and energy supply systems.

  • Perimeter Fence – A secure and durable boundary fence constructed around the campus site to ensure controlled access, enhance safety, and define university property.

  • Laundry Facility – A dedicated structure built to serve student residential facilities, equipped to handle large-scale laundry operations, promoting hygiene and residential comfort.

DBL

  • Building and Water

  • 267,184,409.08 birr

  • N/A

Client: DBL Group (Bangladesh)
Contractor: United Construction PLC
Project Site: Mekelle, Tigray Region, Ethiopia
Project Type: Industrial Park Infrastructure and Facility Construction

As part of DBL Group’s major foreign direct investment in Ethiopia, United Construction PLC was selected to execute a large-scale industrial park development project in Mekelle, Tigray. DBL Group, a leading textile and apparel manufacturer from Bangladesh, is investing in Ethiopia’s growing industrial and export sector, with a vision to establish a fully integrated production facility.

United Construction PLC has been entrusted with the full-scale construction of core and support infrastructure across the industrial complex.

Scope of Work:

  • PMG Unit (28,000 m²) – Construction of a specialized Pre-treatment, Mercerizing, and Garment Processing Unit, designed for high-capacity operations with state-of-the-art structural and utility support.

  • Printing Unit (35,000 m²) – A large-scale facility built to accommodate industrial textile printing machinery and workflow, featuring robust MEP systems and production-ready layouts.

  • Dyeing Unit (25,000 m²) – Engineered for water-intensive and chemically regulated processes, this facility includes reinforced flooring, ventilation systems, drainage integration, and sustainable chemical handling infrastructure.

  • Knitting Unit (25,000 m²) – Construction of an advanced knitting hall designed for textile production lines, machinery placement, and efficient material flow.

Supporting Infrastructure Includes:

Road Construction (5.10 km) , Drainage Works (10.20 km), Substations (No. 01 to No. 06) , Perimeter Fence and Main Gate, Shade Structures & Warehousing , Greenery Development and Storm Water Works

Tercha

  • Water building and Electric installation

  • 193,109,580.44 birr

    or

    1,308,541.95 dollars

  • 07/08/2023 G.C

Client: Southern Nations, Nationalities, and Peoples’ Region (SNNPR) Water, Mines, and Energy Development Bureau
Contractor: United Construction PLC
Project Site: Tercha, SNNPR, Ethiopia

United Construction PLC was contracted by the SNNPR Water, Mines, and Energy Development Bureau to execute a comprehensive water supply improvement project in Tercha. The project is designed to upgrade the town’s water infrastructure through a phased approach that combines civil, mechanical, and supply chain works to ensure sustainable access to clean water for the community.

Project Scope:

  • Part 1: Civil Works for Water Supply System
    Execution of essential civil engineering works including excavation, foundation works, construction of reservoirs, pump stations, pipeline trenches, and associated structural components critical to establishing a robust water supply network.

  • Part 2: Supply of Pipes and Fittings
    Provision and delivery of high-quality pipes, valves, and fittings necessary for the water distribution network, ensuring compatibility, durability, and compliance with national standards.

  • Part 3: Design Review, Supply, and Installation of Electromechanical Equipment
    Detailed engineering review and optimization of design plans, followed by the supply and professional installation of key electromechanical components such as pumps, motors, control panels, and related electrical infrastructure essential for water system operation.

Hoja Dure

  • Water Construction and Electro Mechanical installation

  • 56,687,687.10 birr

  • March 16 2022 G.C

Client: Oromia Water and Energy Bureau
Contractor: United Construction PLC
Project Site: Hoja Dure Town, Oromia Region, Ethiopia

United Construction PLC was awarded the contract by the Oromia Water and Energy Bureau to implement a vital water supply infrastructure project in Hoja Dure Town. This project is designed to enhance the town’s water distribution system, ensuring sustainable and reliable access to clean water for the local community.

Project Scope:

  • Civil Works
    Execution of comprehensive civil engineering tasks including site preparation, excavation, construction of water reservoirs, pump station foundations, pipeline trenches, and other necessary structural works critical to the water supply system.

  • Supply and Laying of Pipes and Fittings
    Provision and professional installation of durable pipes, valves, and fittings in compliance with industry standards, forming the backbone of the water distribution network.

  • Supply and Installation of Electromechanical Equipment
    Delivery and expert installation of electromechanical components such as pumps, motors, control panels, and associated electrical infrastructure to ensure efficient and reliable operation of the water system.

Tum

  • Water Construction

  • 85,204,491.80 birr

  • October 20, 2022 G.C

Client: Water, Mines, and Energy Development Bureau
Contractor: United Construction PLC
Project Site: Tum Town, Maji Woreda, Ethiopia

United Construction PLC was selected by the Water, Mines, and Energy Development Bureau to execute the Tum Town Water Supply and Sanitation Project, located in Maji Woreda. This critical infrastructure project aims to provide sustainable access to safe drinking water and improved sanitation services for the residents of Tum.

Scope of Work:

  • Civil Works
    Comprehensive civil construction activities including site excavation, construction of reservoirs, valve chambers, and pipeline supports to establish the structural foundation of the water supply system.

  • Supply and Installation of Pipes and Fittings
    Procurement, transport, and expert installation of high-quality pipes, valves, and connectors to build a reliable and efficient water distribution network across Tum Town.

  • Supply and Installation of Chlorination System
    Implementation of a modern chlorination system to ensure water quality meets public health and safety standards. This system includes dosing equipment, storage tanks, and control units to disinfect water before distribution.

Koye Feche

  • Water Construction

  • 34,925,723.76 birr

  • 05/02/09 E.C

Client: Addis Ababa Housing Construction Project Office
Contractor: United Construction PLC
Project Site: Koyefeche, Addis Ababa, Ethiopia

United Construction PLC was contracted by the Addis Ababa Housing Construction Project Office to execute the sewerage system construction for the Koyefeche Condominium Site, a critical infrastructure component supporting one of the capital’s major urban housing developments.

Scope of Work:

  • Construction of Sewerage System
    United Construction PLC carried out the complete design review, excavation, installation, and construction of an efficient and modern underground sewerage system to serve the entire Koyefeche condominium compound. The work included:

    • Laying of sewer pipelines

    • Construction of manholes and inspection chambers

    • Integration with the city’s main sewer line

    • Provision for future expansion and maintenance access

Wukromaray

  • Water Construction

  • 148,810,560.20

  • February, 2, 2024 G.C

Client: Tigray Water and Energy Bureau
Contractor: United Construction PLC
Project Site: Wukro-Samre Town, Tigray Region, Ethiopia

United Construction PLC was entrusted by the Tigray Water and Energy Bureau to implement the Wukro-Samre Town Water Supply Project, a comprehensive initiative aimed at improving access to clean and safe water for the local population.

Scope of Work:

  • Civil Works Construction
    Execution of all related civil engineering activities necessary for the development of the water supply system, including site preparation, excavation, foundations, and structural works for reservoirs and support facilities.

  • Supply and Installation of Pipes and Fittings
    Delivery and professional installation of a complete piping network, including high-quality pipes, valves, connectors, and support components to form a robust and efficient water distribution system.

  • Supply and Installation of Electromechanical Equipment
    Installation of critical operational systems including pumps, motors, electrical control units, and associated electromechanical infrastructure to ensure the reliable operation and management of water flow throughout the system.

About us


United Construction PLC is an Ethiopian based independent private multi-sectorial investment company which was established in 1995 E.C (2003 G.C.) that offering a broad range of services in construction works. The company has built a strong reputation in the past decade from a simple to very complex constructions works for delivering quality services on the intended time within a competitive price. Now a day the company has gotten a Grade-1 with Building Construction (BC-1) and Water Works Construction (WWC-1) as well as being highly engaged on the way to be an outstanding level of General Contractor (GC-1) and has successfully earned its ISO 9001:2015 certification by expanding its intervention areas beyond the recent practices in order to play a vital role in the construction industry.

We highly pride ourselves on being skilled and experienced in all aspects of civil work construction and this combines with our broad knowledge of the existing market that has made us one of the foremost players in this industry. Our commitment to innovation and excellence invariably results in a successfully completed project for both the company and clients. In general the company understands and promotes the idea of working in partnership with our customers to ensure their goals are met. Our unique and flexible project management systems ensure that positive outcome has been achieved regardless of the size or nature of the projects at hand.

For the past 12 years the company has faced many unbelievable project challenges which were too difficult to cop up and resolve easily but after enormous struggle with the great challenges, the company has really registered a remarkable change ever since the last 5 years.

OUR CLIENTS


  • Tigray National Construction Exhibition

  • SWEPRS Water, Mine and Energy Bureau

  • From SWEPRS Water, Mines and Sanitation Bureau

  • Beza International Church

Awards and recognition


SWEPRS Water Mine &Energy Bureau

“Your dedication and professionalism in completing the project on schedule are highly appreciated.”

Beza International Church

“Thank you, GOD is not unjust, HE will not forget your work and the love you have shown as you have helped HIS people and continue to help them.” Hebrews 6:10

Get Started


We are at your service since 2003 G.C with dedicated and professional team carrying our future


>

Our company

Our Builds


Contact Us.